By RHEA-FRANCES TETLEY
Historian
The California Department of Safety of Dams (DSOD) had decided the old Lake Arrowhead Dam could fail in case of a massive earthquake so it declared the lake should be lowered by 70 feet until something was done to repair the dam. The homeowners did not like that idea and sought another solution. They quickly put two issues on the election ballot to stop the DSOD from destroying the lake and their beautiful community in that manner.

The Lake Arrowhead Village parking entrance with the kiosk where they took the parking fees.
The Arrowhead Lake Association (ALA) was organized pursuant to the June 1974 agreement with the various homeowner’s associations to pass the bond issue, build the dam and have a legal corporation to purchase the lake. The members of the interim board were President Robert Everhart, G. Thomas Akin, Richard Anderson, Donald Coughlin, Charles Luciano, Eugene Newcombe, Karl Rodi, Ralph Wagner and Anthony Zehenni.
The Arrowhead Woods election on Nov. 5, 1974, was decisive on the two ballot measures. Measure G was for an indebtedness of $7 million for Improvement Zone D-1 of County Service Area (CSA) 70 for flood control. Measure H was for a tax rate not to exceed 10 cents per $100 assessed value to be used to maintain those flood protection facilities. The vote was 90 percent for passing the measures versus 10 percent against both measures.
The community voted loud and clear it did not want Lake Arrowhead lowered 70 feet. The new dam needed to be started by April 1, 1975, and completed by Sept. 1, 1976. If the deadlines were not met, the DSOD could still order the level of Lake Arrowhead lowered.
The property owners agreed with the Boise Cascade Company (the lake’s owner at the time) that they (as a community corporation) would purchase the lake and other properties for a sum of $500,000. Boise Cascade had already been ordered to divest itself of the lake so the timing was excellent. Boise Cascade deeded the land necessary for the new dam to San Bernardino County and advanced the funds necessary to prepare the plans for the new dam.
The contract to build the dam went out to bid but none came in low enough. The contact was modified to eliminate the landscaping and other items not directly tied to the construction of the dam, Hubbs Construction was awarded the contract as low bidder on April 28, 1975 (only 25 days tardy) and work began in May. By August that year, the construction of the dam was underway, with an optimistic completion date of October 1976, only one month after the Measure G deadline date. Fill materials for the rock and cement dam were taken from county land and Boise Cascade property east of the hospital. (The speed of this construction project is unheard of in today’s world of building.)
The negotiations to purchase the lake for $500,000 were not as smooth sailing. The ALA needed to finance the initial $150,000 down payment to buy Lake Arrowhead, Grass Valley Lake, the old dam, the three beach club sites, all of the reserve strips and reserve strip additions and other properties within Arrowhead Woods. It figured out a five-year repayment schedule from lake revenues. The remaining $350,000 would be paid to Boise Cascade over the next 10 years, also from lake revenues.

Winning tickets from the Sportland Arcade, located in the 12-sided pavilion building. It was very popular with the locals and visitors in the 1970s.
By August of 1975, ALA wanted to cash out of the deal but was unable to get the additional funds. One plan to raise the funds was ALA deciding to charge all holders of dock site rights a one-time fee that would enable them to have legal title to their site. Then it could be sold as real property and ALA would reduce dock fees in exchange.
Also in August, ALA was looking for elected board members. To become an ALA member and vote for the new 12-member ALA board of directors, property owners had only to return a post card by Aug. 14, although no membership fee amount had yet been determined. All members were qualified to run for the board.
The new ALA board was elected and took office in September 1975. However, construction of the new dam hit some snags. Change orders raised the price tag, delays were a constant because of frozen ground, rain, snow and other weather problems, and bedrock was deeper underground than expected. (That similar problem had been faced with the construction of the original Lake Arrowhead Dam 70 years before.)
In November 1975, the San Bernardino County Board of Supervisors appointed the CSA-70 D-1 Advisory Commission with seven Arrowhead Woods members, including long-time Lake Arrowhead office administrator Audrey MacKay. She was well known, having lived in the area since the 1940s, and she belonged to many community-minded groups, including the Junior Women’s Club, the Soroptimists, Red Cross, Friends of the ICU (Mountains Community Hospital) and the Lake Arrowhead Chamber of Commerce.

The sign for the movie theater in Lake Arrowhead Village.






0 Comments